Two areas.
One clear budget basis.
Estimated GFA describes a planning allowance. Estimated built-up describes the construction area used for Hitomo’s indicative rebuild budget.
Keep the measurements separate
| Figure | What it means |
|---|---|
| Estimated GFA | An indicative planning estimate. The plot checker uses the main footprint for each selected storey plus a 60% attic allowance when selected. It does not measure walls, voids, headroom or every URA inclusion and exemption. Your QP calculates the actual GFA from the design. |
| Estimated built-up | For this budget, estimated GFA plus additional car porch, covered terrace and roof terrace construction areas. Each area is counted once. The quotation confirms the actual measurement and scope. |
| Land area | The plot itself. Land area is not the floor area used for the construction rate. |
Built-up for the budget
Estimated built-up = estimated GFA + additional car porch + additional covered terrace + additional roof terrace.
Add only areas not already counted in GFA or another component. A planning exemption does not by itself remove construction work from the price. Conversely, an area included in a quotation does not determine its GFA treatment.
The plot checker’s starting allowances
- House GFA: footprint × selected storeys, plus 60% of a floor plate for an attic. Rounded to 50 sq ft.
- Car porch: no automatic allowance. Starts at 0 and is excluded until you enter an area.
- Covered terrace: zero until an area is supplied.
- Roof terrace: the usable outdoor terrace beside the attic. Its construction area is included in built-up. An initial allowance of the remaining 40% of one floor plate when an attic is selected, rounded to 50 sq ft; zero otherwise.
Confirm the terrace and other construction areas against the proposed design; enter the confirmed built-up total in the detailed estimator. Unentered porch or additional terrace work is excluded from the budget. These defaults are estimating assumptions. They are not surveyed areas, a proposed porch approval, or measurements taken from the 3D roof. The roof’s visible terrace size may differ; enter a designer’s measured areas when available. Other terraces at different levels need their own design quantities and must be counted once.
How the price follows
Base construction budget = estimated above-ground built-up × selected construction rate.
Indicative 2026 rates, including professional fees: Standard S$300–400 per built-up sq ft; Premium S$400–500; Luxury S$500–650+. The written quotation confirms what is included.
For estimated built-up of 7,000 sq ft and above, both online calculators show “Larger build—request a tailored budget”. This temporary pricing threshold uses built-up, not land area or GFA, and is not a URA classification. Below 7,000 sq ft, the plot result shows a base range before contingency. The detailed estimator adds selected outside-base features and a visible 10% planning contingency. Known piling, basement, GST, authority charges and owner costs remain separate as stated. Do not add a feature again when it is already included in the base scope.
Basement and upgrades
The base area above excludes basement. Use the separate basement allowance or a project-specific scope; do not include its area in the base and add its full cost again. Porch or roof-terrace upgrades are only additional to the agreed base specification, rather than a second charge for the same area.
Project figures remain project-specific
A published built-up figure for a designed home can include a different mix of levels, mezzanines, porches, terraces and other agreed construction areas. The generic plot estimate is not a replacement for that project’s measured schedule. For 20 Simon Road, retain the published 4,424 sq ft built-up figure pending confirmation against its own documents.
GFA rules and exceptions are defined by the URA GFA Handbook; your appointed professionals confirm the proposal. Hitomo’s area schedule and written quotation confirm the construction pricing basis.